BUILDINGS FOR GAS RAIL TERMINAL FACILITY
 
     
  A control building and a utilities building for a railhead facility to load butane gas for domestic use.

Location: Attabiyeh, Deir Ezzor, Syria.
Client: Ouais Group (Contractor to CSDGL - CONOCO).
ACE Participation: Full Design and Follow -up of Construction.
Design Completion: 2001.
Construction Completion: 2001.
Cost: 0.2 million U.S. Dollars (Civil Works).