DREIKEESH HOSPITAL (PHASE 2)
 
     
  Second stage of a previous project, additional floor with 60 beds for a general and obstetrics hospital with a total area of 3200 m2.

Location: Dreikeesh, Syria.
Client: LEAD Co.
ACE Participation: Full Architectural, Structural, Mechanical and Electrical Design.
Design Completion: 2004.
Construction Completion: 2004.
Cost: 0.75 million U.S. Dollars (building only).